Hugh Simpson Contractors Hugh Simpson Contractors - Northern Scotland`s leading lifting and plant-hire firm.

Telephone 01955 604444

Office Address South Quay, The Harbour, Wick, KW1 5HA

Case Studies

Unloading pipes from MV Wilson Wisla, Wick Harbour

Posted: July 22nd, 2019

Customer Mannesmann Line Pipe GmbH Project overview Hugh Simpson (Contractors) Ltd arranged the shipment and unloading of 932 raw black steel pipes (12.2 m long with 406.4 and 273.1 mm outer diameter) from a marine vessel Wilson Wisla, which arrived in Wick Harbour on 22/07/2019. Two cranes were …
Read more…

Movement of specialised fabricated steel modular units

Posted: July 1st, 2019

Customer JGC Engineering and technical services Ltd. Project overview Hugh Simpson (Contractors) Ltd transported specialised fabricated steel modular units from JGC T3 building in Janetstown to Scrabster harbour. The biggest unit was 7.1 m wide, 14.4 m long and 6.0 m high. The height of the trailer and load was 6.9 m. The route was …
Read more…

Unloading pipes from MV Lady Ariane, Wick Harbour

Posted: June 28th, 2019

Customer Liberty Steel Project overview Hugh Simpson (Contractors) Ltd unloaded pipes (18 m long with 1524 mm outer diameter, each pipe 12 tons) from a marine vessel Lady Ariane, which arrived in Wick Harbour on 27/06/2019. Two cranes were set up, fitted with vacuum lift units to unload …
Read more…

Unloading pipes from MV Fluvius Plym, Wick Harbour

Posted: June 21st, 2019

Customer Liberty Steel Project overview Hugh Simpson (Contractors) Ltd unloaded 90 pipes (18 m long with 1524 mm outer diameter, each pipe 12 tons) from marine vessel Fluvius Plym, which arrived in Wick Harbour on 19/06/2019. Two cranes were set up, fitted with vacuum lift units to unload …
Read more…

Discharging railway lines from MV Amy, Scrabster Harbour

Posted: June 18th, 2019

Customer GP Shipping Project overview 17/06/2019 Hugh Simpson (Contractors) Ltd unloaded railway lines from MV Amy at Scrabster harbour. Hugh Simpson (Contractors) Ltd was responsible to discharge 784 railway lines, each 18 m long and weighing  0.86 Tonnes. The rails  were lifted in bundles of 5, each bundle 4.3 Tonnes. …
Read more…

Unloading pipes from MV Scot Trader, Wick Harbour

Posted: June 10th, 2019

Customer Liberty Steel Project overview Hugh Simpson (Contractors) Ltd unloaded 117 pipes (18 m long with 1524 mm outer diameter, each pipe 12 tons) from  marine vessel Scot Trader, which arrived in Wick Harbour on Friday.  Two cranes were set up: one fitted with a vacuum lift and another with …
Read more…

Transportation of specialised fabricated steel modular units, Janetstown

Posted: May 15th, 2019

Customer JGC Engineering and technical services Ltd. Project overview Hugh Simpson (Contractors) Ltd transported specialised fabricated steel modular units from JGC T3 building in Janetstown to Scrabster harbour. The biggest unit was 7.1 m wide, 14.4 m long and 6.0 m high. The height of the trailer and load was 6.9 m. The route was …
Read more…

Unloading pipes from MV Helen Anna, Wick Harbour

Posted: March 13th, 2019

Customer Kestrel Liner Agency Ltd. Project overview 04/03/2019 Hugh Simpson (Contractors) Ltd. unloaded in total 1652 steel pipes from a Marine Vessel Helen Anna, which arrived in Wick harbour on Monday. We operated a crane and a vacuum pipe lifter simultaneously to discharge the vessel. The unloading required …
Read more…

Discharging lime boat Eems Delta, Wick Harbour

Posted: March 11th, 2019

Customer Hugh Simpson (Contractors) Ltd. Project overview 11/03/2019 Hugh Simpson (Contractors) Ltd. discharged in total 1586 tonnes of bulk ground lime from a Marine Vessel Eems Delta, which arrived in Wick harbour on Sunday. We operated two material handlers with clamshell bucket attachments. Lime was loaded directly into …
Read more…

Unloading pipes from MV Peak Amsterdam, Wick Harbour

Posted: March 11th, 2019

Customer Kestrel Liner Agency Ltd. Project overview 16/01/2019 Hugh Simpson (Contractors) Ltd. unloaded in total 1092 steel pipes from a Marine Vessel Peak Amsterdam, which arrived in Wick harbour on Wednesday. We operated two cranes simultaneously to discharge the vessel. The unloading required two teams with four slingers/ …
Read more…

Unloading reefer ship Svartfoss, Scrabster Harbour

Posted: January 30th, 2019

Customer Eimskip Agency Project overview 29/01/2019 Hugh Simpson (Contractors) Ltd unloaded refrigerated cargo from Svartfoss at Scrabster harbour. Hugh Simpson (Contractors) Ltd acted as stevedores in cooperation with  Sandisons shipping, which is the shipping agent that liaises with the customer, harbour authorities, ships crew and transport company. We have been …
Read more…

Dismantling lighting tower, Wick Harbour

Posted: December 10th, 2018

Customer Wick Harbour Authority Project overview 6/12/2018 Hugh Simpson (Contractors) Ltd. dismantled and removed a lighting tower from Wick Harbour Commercial quay. The lighting tower was over 30 m high, which required our operatives to work at considerable heights. The tower was cut in 4 sections, each approximately …
Read more…

Unloading rail wagons with 18 and 27 m pipes, Georgemas

Posted: October 4th, 2018

Customer Deutsche Bahn Project overview Pipes arrive at Georgemas by rail, where our team unloads them directly onto the lorry or onto the storage at site. Pipes are 18 and 27 m long with 1472  and 1253 mm outer diameter and each pipe weighs around 13 tons. The project will …
Read more…

Transportation of 8 x 8 m steel structures

Posted: October 2nd, 2018

Customer JGC Engineering and technical services Ltd. Project overview Hugh Simpson (Contractors) Ltd conducted the loading of steel units onto trailers at two JGC locations at T3 building in Janetstown and at Harpsdale Workshop and transporting them to Scrabster harbor. One of the units was 7.62 wide and …
Read more…

Unloading rail wagons with 12 and 14 m pipes, Georgemas

Posted: October 2nd, 2018

Customer Deutsche Bahn Project overview Since May throughout September Hugh Simpson (Contractors) Ltd has been unloading pipes at Georgemas rail junction. The pipes are loaded at production in Hartlepool and arrive at Georgemas by rail operated by the Deutsche Bahn. The pipes are 12 and 14 m long …
Read more…

Lifting Seacat Intrepid for Seacat Services, Wick Harbour

Posted: October 2nd, 2018

Customer Seacat Services Ltd. Project overview Hugh Simpson (Contractors) Ltd. lifted offshore support vessel Seacat Intrepid onto the quay in Wick and back into water as it needed some repair done. The vessel was lifted in tandem using 500 T and 350 T cranes, and wire and round slings (basket …
Read more…

Need more information?

Please contact us to discuss your needs by pressing the button below:

Contact Us


Recent News See what’s happening at Hugh Simpson Contractors…

Integrated management system certified according to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018

Read more | View News Archive

Recent Projects & Case Studies