17/06/2019
Hugh Simpson (Contractors) Ltd unloaded railway lines from MV Amy at Scrabster harbour.
Hugh Simpson (Contractors) Ltd was responsible to discharge 784 railway lines, each 18 m long and weighing 0.86 Tonnes. The rails were lifted in bundles of 5, each bundle 4.3 Tonnes.
Once discharged from the vessel the railway lines were transported to a temporary storage area.