Unloading rail wagons with 12 and 14 m pipes, Georgemas

Customer

Deutsche Bahn

Project overview

Since May throughout September Hugh Simpson (Contractors) Ltd has been unloading pipes at Georgemas rail junction. The pipes are loaded at production in Hartlepool and arrive at Georgemas by rail operated by the Deutsche Bahn.

The pipes are 12 and 14 m long and 323-409 mm in diameter. Over a period of 5 month we have offloaded around 2600 pipes.

The challenge of this project was the limited time allowed for lifting, as  the operations had to cease when the trains were passing by. Through careful planning and preparations the average time the team spent offloading a wagon was less than 20 minutes.

Our approach

  • The team used Sennebogen 875E material handler with vacuum lift attachment to lift up to 4 pipes in one lift.
  • Operational tests and checks are performed before each shift.
  • Pipes are unloaded from the rail wagons onto pipe storage system on the site or loaded directly onto lorries, which are then transported to the customer site.
  • The operations must cease due to trains passing by.
  • Pipes are tied down according to the load restraint guidelines and transported to the customer site.

Read other case studies here.

Need more information?

Please contact us to discuss your needs by pressing the button below:

Contact Us


Recent News See what’s happening at Hugh Simpson Contractors…

Recent Projects & Case Studies