Customer
JGC Engineering & Technical Services Ltd
Project overview
22/07/2021
Hugh Simpson (Contractors) Ltd transported a door structure which has been built in a dual purpose restraint and transport frame:
- The lorry trailer arrived on site to allow the structure to be loaded on to the trailer
- Both the transit frame and the door were lashed to the trailer to prevent any unplanned or excessive movement of the load during movement
- Due to the total length of the trailer including tractor unit, the load movement from JGC to the installation site was escorted by Police
- Once unloaded the transport frame was returned to JGC site.